HYATT PLACE

HYATT PALACE - Photo 1

Introduction

Surrounded by the traditional souks, the beautiful Arabesque limestone building of Hyatt Place is located in the heart of Deira. At this Hyatt Place, designed by Kling Consult, the fire-safety blends with beautiful designs.

The property ensures pleasant, exciting and recreational stays by optimizing comfort, safety and design. While creating open and recreational spaces, paramount importance has been given to the safety of the guests.

The gymnasium is fitted with Contraflam Structure 60 butt-joint fire-rated glass partition. The frame-less glass partition offers a view to the outside and keeps the occupants safe from the hazards of a fire-spread. Contraflam Structure 60 offers EI fire-rating, which means that the glass maintains its integrity and provides complete thermal insulation for a duration of one hour. The lift lobbies are compartmentalized to prevent the spread of fire into the lift shafts and to upper floors. Fire-resistant butt-joint glass partitions and glass doors are installed on the lift lobbies of all the floors. The edges of the butt-joint partition is customized with a special white ceramic frit design, conceptualized by the main architect at Kling Consult, on its vertical edges.

Highlights

Glass feature
Fire & High Security
Frame type
None
Applications
Doors, Partitions
Market Segment
Hospitality & Leisure

Products used

Contraflam 60-3/4

30mm thickness

EI 60 fire-resistant butt-joint partitions and doors in Gymnasium.

 

Contraflam Structure 60

31mm thickness (600 sq.m)

EI 60 butt-joint partitions and doors in Lift Lobby.

 

Contraflam Structure 60

Design on the glass edges

EI 60 Butt-joint glass partitions in the Lift Lobby using CFS 60 with CERAMIC FRIT design on the glass edges.

 
HYATT PALACE - Photo 2

PROJECT KEY ACHIEVEMENTS

  • Customized ceramic frit design on the glass:-
    The main architect proposed a custom special design to be printed on the vertical edges of the glass. Using special ceramic frit screens, the personalized design was applied on the glass.

Project Key Challenges

  • Lead time: The glass was required to be manufactured and delivered at the project site in a very short time line. By strategically planning the installation at different areas in the project and speeding up the production schedules accordingly, the glasses were shipped in batches and the complete execution at site was completed before the deadline.
HYATT PALACE - Photo 3

Stakeholders

Architect

Kling Consult

Glass customer

Al-Deyar Metal Building Construction LLC

System Partner

Al-Osool

Building Owner

Hyatt Place

Photographer

Chris Goldstraw

Related Cases

Request a quote

To best support you on your quote request, we’ll need some basic information. Simply fill out the form and we’ll get back to you.

Contact Us

Whether you are looking for specific information about our solutions or advice for a project, we would be delighted to talk to you.